01NEW BUILD
New construction
Coordinate the first roof assembly with the building design, deck, drainage plan, insulation strategy, rooftop equipment, penetrations, access, and construction sequence.
02NEW ROOF AREA
Additions and alterations
Plan new low-slope roofing where a building expands or changes, including the elevations, tie-ins, transitions, drainage paths, and details where new work meets existing construction.
03AFTER QUALIFICATION
Roof-over installation
The separate overlay service determines whether an existing roof can responsibly remain. If it qualifies, installation planning defines the new roof layer and its connections to the approved existing assembly.